Blog

  • Replaced SPH-4 Headset

    I found out the hard way that helicopter and military aviation headsets and helmets with integrated headsets use different impedance electronics than general aviation.

    SPH-4 Helmet with HS-1 Speakers and Microphone/Boom

    I found an HS-1 on eBay for pretty cheap.  I took apart the SPH-4 and rewired it… which went really well but made me sad because the guy I bought the SPH-4 from took really good care of it!

  • Roll Actuators

    Roll Actuators, Spring, and Double-Cardan

    Finally got the roll actuator tracks cut and the framework built to support them.  I will be so happy when I am done working under the trailer!  If you are cutting 2″ square steel pipe you must have an angle grinder with a cutting wheel.

  • Main Cylinder

    Main cylinder and pitch actuator shaft

    I placed the main cylinder and cut the deck boards around the pitch actuator channels.  Next step is to secure the main cylinder and cut some channels for the roll actuators.

  • Thanks iModules

    My boss has had a long-standing program to encourage prompt meeting attendance – if you are late, you owe a buck.  Once the pool grows to a C-note we donate it to a worthy cause (last time it went to Jack’s Heart Fund).  This time my boss made an online ballot using our Encompass product and asked us all to cast a vote.  He added me to the ballot because of this project and I was just tickled.  To the amazement of us both, I won!

    I am deeply appreciative of the support from my coworkers and friends in the development team.  I promised to post what I purchased with those funds and you will find it very fitting – it is a cylinder to replace the center column which will hold the majority of the weight of the enclosure (approximately 1600 pounds) and allows for up to 16 inches of heave.

    Purchased one of these Parker 2A Cylinders on eBay (paid $108 with shipping)

    I think it would be great as a group to take the simulator to Children’s Mercy (one of our clients) when it is finished.  The feeling is priceless!

  • Universal Joint

    Flange and threaded rod

    I took the double-cardan to a local machine shop and they removed the extra 2″ steel pipe off the end, tapped and threaded a hole into the bottom of the yoke for a 3/4-16 bolt and then welded a flange on there that I had bought as a makeshift spring perch.  After I got it back I painted it blue… 😉

    Why does it look so much more awesome in blue?
  • Deckover Trailer

    Tucked away in an inconspicuous place!

    We had a successful mission to Texas and back.  We even received a compliment about the trailer from a toll operator in Oklahoma!  The mission was not without casualties – somewhere in the first half of the trip back we lost one of the two ramps (we think it was a defective locking pin because we have a picture of it properly locked when we departed).

    I had to open a section of fence and turn it into a gate so we can move the trailer again more easily later.

    Section of fence removed
  • Picking up the Trailer on Saturday

    Brand new 2009 model year deckover trailer just east of Dallas.  I will be accompanied by my friend Philip who had no hesitation when I called and asked him to join me out of the blue!  State Farm agent is coming out over my lunch break to have me add it to my policy.

    Parker DO8412
  • Floor and Motion Base are Framed

    I got some time to assemble the platform framing for the enclosure (foreground) and the frame for the motion base that will sit on the concrete pad (background).  My son came to inspect my work.  The universal joint looks awfully small compared to the platform.

    Sly is checking my work
  • Easy Come, Easy Go

    We received it Wednesday but I didn’t get to take it out and test it until today.

    It powered on and the menu was very vibrant but once I started a movie I noticed there was a “valance” effect on the top which would be visible inside the cockpit.  The seller offered to have UPS pick it up free of charge or he would refund $150.  I opted to have him pick it up and he will try and replace it with a working unit.

  • Decentralized Stabilization

    Your design looks sound but you need a decentralized stabilizer.

    The decentralized stabilizer is a mechanism that needs to be installed on the edge of the platform to make sure that is stays in the same direction as the pneumatic cylinder alows the platform to turn 360°. This must be quite strong as the forces on this are high.

    Met vriendelijke groet,

    Marnix T

    President

    I thought that was really nice for him to go so far as to give me advice on my design since he builds these professionally.  I can see why they charge so much, there are a lot of specialized pieces which have added up to $2000 easily when all is said and done (let alone the custom software I will need to write).

    The moral of the story is if they sell a large-bore non-rotating cylinder – BUY THAT.  I know they have non-rotating cylinders but haven’t seen one that big.  You could also tie two of them together (I think most of the non-rotating ones have 2 rods) so that there is a single U-joint at the top.